Annual Report of the Harbor and Land Commissioners, for the Year ..., Հատոր 14Rand, Avery, & Company, 1893 |
Այլ խմբագրություններ - View all
Common terms and phrases
Board of Harbor Boston harbor breakwater bulkhead caused these presents channel in Boston Charles River chief of engineers city of Boston COMMONWEALTH OF MASSACHUSETTS Company for license Congress Street Connecticut River contract cubic yards deep at mean deposited dumping EASTERN DREDGING COMPANY extend his wharf feet deep feet depth feet wide feet width fill solid Fort Point channel George W grade 13 Granted Dec Granted Feb Granted June Granted Nov Granted Sept Harbor and Land Hearing given improvement jetty June 30 Land Commissioners license to build license to extend license to fill license to widen Maine Railroad mean low water Mystic River name and behalf navigation northerly side o'clock P.M. party petitioners pile wharf Point channel Pond portion provides remove reserved channel Saugus River schooner SEAL shoal shore South Boston Flats Street bridge sunk Swampscott tons gross tonnage Townsend Weymouth Fore River wharf on piles wreck yards of material
Սիրված հատվածներ
Էջ 58 - PARTY OF THE SECOND PART. The said party of the second part, hereby covenants and agrees with the said party of the first part...
Էջ 69 - Board of Harbor and Land Commissioners, has caused these presents to be signed and delivered in its name and behalf, and the...
Էջ 74 - States, in such manner as shall obstruct or impair navigation, commerce, or anchorage of said waters, and it shall not be lawful hereafter to commence the construction of any bridge, bridge draw, bridge piers, and abutments, causeway, or other works over or in any port, road, roadstead, haven, harbor, navigable river, or navigable waters of the United States, under any act of the legislative assembly of any State, until the location and plan of such bridge or other works have been submitted to and...
Էջ 43 - At the adoption of the present project the channel was limited to 9 feet at high water, and was too narrow, and too much obstructed by bowlders for easy navigation by the craft making use of it.
Էջ 44 - At the adoption of the present project the 15 5 feet depth anchorage covered only about 47 acres, and the 34 additional acres to be dredged carried an average of about 12 feet depth of water at low water. During the last fiscal year comparatively little work was done ; 6,360 cubic yards were excavated, increasing the 15} foot anchorage by 1.1 acres in area.
Էջ 43 - Congress, second session, provides for the widening and deepening of the river so as to secure a channel of at least 12 feet depth at high water, with 100 feet width from its mouth up to...
Էջ 38 - Island dike are in the same condition as at the date of my last report, no work having been done during the year. A contract is now in force with Geo. Willett Andrews to deposit 15,000 tons of rubble stone in the north jetty, and this work will probably be commenced early in the year 1893. The annual survey of the bar was made in June, 1892. It showed that the channel across the bar had straightened, widened and deepened since the survey of 1891. It is not less than 13.1 feet deep at mean low water...
Էջ 39 - The project proposes to excavate a straight channel 3,900 feet long, 50 feet wide, and 6 feet deep at mean low water, from the " Back " Channel to "Rice's" Wharf, at an estimated cost of $17,600.
Էջ 74 - States where no harbor-lines are or may be established, without the permission of the Secretary of War, in any port, roadstead, haven, harbor, navigable river, or other waters of the United States...
Էջ 45 - The existing project of 1888. as modified in 1889, provides for the protection of the "Chops" (or headlands) from erosion and the intervening harbor from being filled...