Թաքցված դաշտեր
Գրքեր Գրքեր
" Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building and inside the walls, and arranged to cut off the entire current from the building. "
Science and Industry - Էջ 258
1902
Ամբողջությամբ դիտվող - Այս գրքի մասին

Transactions of the American Institute of Electrical Engineers

American Institute of Electrical Engineers - 1897 - 710 էջ
...construction, Nos. 44. and 43.) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the switch required by Rule No. 22 is inside the building, the cut-out required by this section...
Ամբողջությամբ դիտվող - Այս գրքի մասին

Transactions of the American Society of Mechanical Engineers, Հատոր 19

American Society of Mechanical Engineers - 1898 - 1122 էջ
...No». 44 and 45.) a. Must be placed on all service wires, either overhead or under" ground, as near as possible to the point where they enter the building and inside the walls, and be arranged to cut off the entire current from the building. Where the switch required by Rule No....
Ամբողջությամբ դիտվող - Այս գրքի մասին

Electrical Engineer's Pocket-book: A Hand-book of Useful Data for ...

Horatio Alvah Foster - 1901 - 1018 էջ
...construction Nos. 52 and 53.) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building and inside the walls, and arranged to cut oil the entire current from the building. "Where the switch required by rule No. 22 is inside the building,...
Ամբողջությամբ դիտվող - Այս գրքի մասին

Distributing system and lamps

Francis Bacon Crocker - 1901 - 528 էջ
...each of all service wires as near as possible to the point where they enter the building, on inside of the walls, and arranged to cut off the entire current from the building. The wires then run to the service switch, which should be capable of opening the circuit when carrying...
Ամբողջությամբ դիտվող - Այս գրքի մասին

International Library of Technology: A Series of Textbooks for ..., Հատոր 13

1902 - 738 էջ
...and Circuit-Breakers) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the required switch is inside the building, the cutout required by this section must be placed...
Ամբողջությամբ դիտվող - Այս գրքի մասին

Agents' and Inspectators Pocket-book of Fire Protection

George Velten Steeb - 1902 - 230 էջ
...cut-outs, fuses, or circuit-breakers on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building, must be placed at every point where a change is made in the size of the wire, unless the cut-out in...
Ամբողջությամբ դիտվող - Այս գրքի մասին

Standard Wiring for Electric Light and Power: As Adopted by the Fire ...

Harry Cooke Cushing - 1902 - 204 էջ
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected...
Ամբողջությամբ դիտվող - Այս գրքի մասին

Practical Lessons in Electricity. Elements of Electricity. The Electric Current

American School (Lansing, Ill.) - 1903 - 320 էջ
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected...
Ամբողջությամբ դիտվող - Այս գրքի մասին

Cyclopedia of Applied Electricity: Current measurements; Wiring; Telegraph

1905 - 484 էջ
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected...
Ամբողջությամբ դիտվող - Այս գրքի մասին

Storage Batteries ; Incandescent Lighting ; Arc Lighting ; Interior Wiring

1906 - 544 էջ
...are also provided. a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the required switch is inside the building, the cutout required by this section must be placed...
Ամբողջությամբ դիտվող - Այս գրքի մասին




  1. Իմ գրադարանը
  2. Help
  3. Գրքերի ընդլայնված որոնում
  4. Download EPUB
  5. Բեռնել PDF