| United States. Court of Claims - 1948 - 886 էջ
...the work given in drawings or specifications has been obtained by Government representatives * * * : Should the Contractor encounter, or the Government discover, during the progress of the work, subsurface or latent conditions at the site materially differing from those shown on the drawings or... | |
| United States. General Accounting Office - 1929 - 804 էջ
...and the contact shall be modified in writing accordingly," while article 4 of the contract provides: Should the contractor encounter, or the Government discover, during the progress of the work, subsurface and (or) Intent conditions at the siie materially differing from those shown on the drawings... | |
| United States. Bureau of Reclamation - 1930 - 132 էջ
...contractor from proceeding with the prosecution of the work so changed. ARTICLE 4. Changed conditions. — Should the contractor encounter, or the Government discover, during the progress of the work, subsurface and (or) latent conditions at the site materially differing from those shown on tho drawings... | |
| United States. Congress. House. Committee on Naval Affairs - 1930 - 1642 էջ
...reasonable amount. Article 4 of the contract reads as follows : ASTICLE 4. Changed conditions. — Should the contractor encounter, or the government discover, during the progress of the work subsurface and (or) latent, S9380-28— No. 25 (71) 72 conditions at the site materially differing... | |
| United States. Department of the Interior, Ray Lyman Wilbur, Elwood Mead - 1933 - 338 էջ
...contractor from proceeding with the prosecution of the work so changed. ART. 4. Changed conditions. — Should the contractor encounter, or the Government discover; during the progress of the work, subsurface and (or) latent conditions at the site materially differing from those shown on the drawings... | |
| United States. Army. Corps of Engineers - 1934 - 396 էջ
...site materially differing from *;:ose shown on the drawings or indicated in the specifications, or unknown conditions of an unusual nature differing,...ordinarily encountered and generally recognized as being inherent in work of the character provided for in the plans and specifications, the Deputy Contracting... | |
| United States. Congress. House. Committee on Military Affairs - 1935 - 812 էջ
...contractor from proceeding with the prosecution of the work so changed. ARTICLE 4. Chanffed eonditwng. — Should the contractor encounter, or the Government discover, during the progress of the work, subsurface and (or) latent 113668 — '" »' conditions at the site materially differing from those... | |
| United States. Congress. House. Committee on Military Affairs - 1935 - 990 էջ
...from proceeding with the prosecution of the work so changed. Awn-rOLE 4¿ Changed eonditioas.—Should the contractor encounter, or the Government discover, during the progress of the work, subsurface and (or) latent 11 3666—'¿---——1 I conditions at the site materially differing from... | |
| 1939 - 1306 էջ
...contractor from proceeding with the prosecution of the work so changed. AST. 4. Changed conditions. Should the contractor encounter, or the Government discover, during the progress of the work subsurface and/or latent conditions at the site materially differing from those shown on the drawings... | |
| United States. Bureau of Public Roads, United States. Public Roads Administration - 1941 - 550 էջ
...conditions at the site," as used in article 4 of Form 23 shall be construed to mean and to refer solely to conditions of an unusual nature differing materially...as inhering in work of the character provided for in the plans and specifications. ( 6 ) It is further agreed that any modifications of the contract... | |
| |